Quality · Six Sigma

Cost of Poor Quality (COPQ)

Classifies quality-cost line items into the PAF model (prevention, appraisal, internal failure, external failure), reports the conformance vs nonconformance split and COPQ, and benchmarks each as %...

In the menus Quality › Six Sigma › Cost of Poor Quality (COPQ)

Also searched as copq cost of quality cost of poor quality quality costs scrap and rework cost

When to use it

You have quality-related cost line items (scrap, rework, warranty, inspection, training…) and need the classic quality-cost picture: where the money goes, what poor quality actually costs, and whether the spend is skewed toward failure instead of prevention.

When not to: When category labels do not describe quality-cost activities at all (the classifier will report everything as unclassified and the card will refuse with too little classified data), or when you need a statistical comparison of costs across periods or plants rather than a single-period rollup: export the classified totals and use a hypothesis test or control chart on the resulting series instead.

Step by step

  1. Open it from the menu

    Click Quality in the menu bar; under Six Sigma choose Cost of Poor Quality (COPQ).

  2. Fill in the form

    Choose the columns: Cost categories, Cost of each item. The form lists only columns whose type fits each field.

  3. Check the options

    The options start at their defaults: Total revenue (same period). Change one only when your question needs it.

  4. Run the analysis

    Press Run analysis. The Result Card opens on its Results tab.

What to choose in the form

Fields of the Cost of Poor Quality (COPQ) form
Cost categories Category requiredOne categorical column. Quality-cost category label per line item
Cost of each item Cost requiredOne numeric column. Cost of each line item (same currency)
Total revenue (same period)Optional: enables the % of revenue benchmark.

How to read the card

The Results tab starts with what to know first (rows left out, checks that did not pass), then the interpretation in words and the Key Results; charts and assumption checks follow further down. Learn More explains the method in plain words. Read a Result Card covers all four tabs.

A worked example

A plant logs 40 quality-cost line items over a quarter: prevention programs and calibration (prevention/appraisal), scrap and rework (internal failure), and warranty claims (external failure), against $2.1M of quarterly revenue.

Result: Conformance spend = $58,000; COPQ = $214,000 (of which $97,000 is external failure); total cost of quality = $272,000, or 13.0% of revenue.

13% of revenue sits in the unmanaged-process range on the Juran benchmark, and nearly half the COPQ is external failure (the most expensive category per the 1-10-100 rule), which argues for investigating what is escaping to customers before it is caught internally, rather than simply spending more on inspection.

From the Statistics Library.

The code tabs

Code gives this analysis as Python, R and MATLAB code (and SAS where the tab offers it), reading the data the way KernelStats did. Export sends the card to a report or to slides. See The Code tab.

Understand the statistics

Ask Oobi

Type one of these into Ask Oobi beside your data:

  • Our plant spends on inspection, scrap, rework and warranty claims: what fraction of revenue is the cost of poor quality, and are we under-investing in prevention?
  • Explain the cost of Poor Quality (COPQ) in plain words.
  • What does process capability index mean?

Last reviewed November 16, 2026.

Report an unclear step