Understand the idea
Cpk is built on an assumption that is easy to forget: that the process being measured is BEHAVING CONSISTENTLY, the same underlying distribution generating every point, just with ordinary random scatter around it. If the process itself is shifting, drifting, or occasionally jumping to a different level, there is no single, stable distribution for Cpk to describe.
Computing Cpk anyway, on data from an unstable process, is like calculating the 'average speed limit' of several different roads with different limits mixed together: the number you get is a real calculation, but it does not describe any one coherent thing, and acting on it can be actively misleading.
The correct order of operations is always: first confirm the process is stable (via a control chart, checking for out-of-limit points and non-random patterns), and ONLY THEN compute Cp/Cpk on that stable data. Skipping the control-chart step and jumping straight to a capability number is one of the most common misuses in quality practice.
Process stability means the process shows only its ordinary, common cause variation, with no points or patterns on the control chart signaling special cause variation. Reporting Cpk from an unstable process is the classic Cpk misuse: the number describes a process that does not stay the same.
In the two-phase approach, often written Phase I Phase II SPC, Phase I builds a stable baseline and its control limits, and Phase II watches new data against them; a capability index belongs only after Phase I has shown stability.
Practitioner explanation
Cp/Cpk's derivation assumes the process output at any given time is drawn from ONE fixed normal distribution with parameters mu and sigma; an out-of-control process (special-cause variation present) is by definition not being generated by one such fixed distribution, so sigma_hat estimated from that mixed data does not describe any single, real, reproducible process behavior, and the resulting Cpk has no stable interpretation; it is not 'wrong' so much as UNDEFINED for the thing it claims to measure.
This is why capability studies conventionally follow, not replace, a control-charting phase (Phase I: establish control; Phase II: monitor and, separately, assess capability once control is established); computing Cpk directly from raw incoming data without first passing a control-chart check inverts this order and is a recognized, common misuse.
KernelStats' Process Capability (Cp / Cpk / Pp / Ppk) card documents the stability precondition directly in its guidance text and treats an unstable process as a serious caveat on the reported Cp/Cpk figures, since the tool computes the requested capability numbers on the data it is given but the analyst is responsible for having established control first via the corresponding control-chart function.
Worked example
Scenario
A process shows an X-bar chart with several points beyond the control limits and a sustained upward trend across shifts.
Result
Cpk is nonetheless computed directly from the full dataset and reported as 1.15.
Interpretation
Because the process was shown to be out of control, that Cpk of 1.15 does not describe a single, stable process; it is an average over a moving target and could look very different tomorrow. The correct next step is to identify and remove the special cause of the instability, re-establish control, and only then recompute Cpk on the now-stable data.
Common misconceptions
Misconception
Cpk can be computed and trusted from any batch of process data, whether or not the process has been shown to be stable.
Correction
Cpk assumes a single, stable distribution generating the data. Computed on data from a process shown to be out of control (via its own control chart), Cpk describes a moving target rather than a real, reproducible process capability.
References
- NIST/SEMATECH e-Handbook of Statistical Methods, §6.1.6 What is Process Capability?, NIST/SEMATECH (2012), §6.1.6.
